ҚазҰАЗУ | КазНАИУ | KazNARU
Operation of hydraulic structures and pumping stations KZ-UZ

Training competitive specialists in the field of water management with in-depth knowledge of the operation of hydraulic structures and pumping stations.

back blur blue element back blur blue element
List of qualifications and positions

Hydraulic Engineer

Engineer - Hydraulic Engineer

Engineer for Construction of Hydraulic Structures

Field of professional activity

Operation of hydraulic structures and pumping stations; operation of hydraulic systems; ensuring the safety of hydraulic structures; organization and implementation of repair works

Scope and object of professional activity

Reservoirs and hydraulic structures

Pumping stations

River intake structures

Canals and hydromelioration systems

Design, survey, research and construction organizations

Functions of professional activity

Organization and control of technical operation of hydraulic structures and pumping stations Planning and organization of construction, reconstruction and repair works of hydraulic structures Development of design documentation and technical solutions Ensuring the safe operation of hydraulic structures Organization and implementation of repair and |maintenance of equipment

Types of professional activity

1. Operational Activity:

- Ensuring uninterrupted and efficient operation of

hydraulic structures (HS) and pumping stations (PS)

- Conducting regular inspections, maintenance and

scheduled repairs of equipment and structures

- Monitoring compliance with operation regimes,

technological processes and regulatory requirements

- Maintaining technical documentation and

reporting

2. Design Activity: 

- Participation in development of design

documentation for reconstruction or modernization of HS and PS

- Preparation of technical specifications,

calculations and material/equipment specifications

- Analysis and evaluation of design solutions in

terms of efficiency, reliability and safety

- Development of measures to optimize operation

modes and improve energy efficiency

3. Construction and Installation Activity:

- Organization and control of reconstruction works of existing HS and PS

- Ensuring compliance with design solutions, building norms, labor and environmental safety requirements

- Acceptance and commissioning of newly built or

reconstructed facilities

4. Repair and Recovery Activity:

- Organization and execution of works to  restore the functionality of HS and PS after accidents, damages or wear

- Development and implementation of major

repair and modernization plans

- Application of modern technologies and

materials during repair works

Have skills

Operation, maintenance and repair of hydraulic structures and pumping stations; design of hydraulic systems; organization of construction works; ensuring safety of hydraulic facilities

Curriculum of the educational program

ОП 6В07301 Эксплуатация гидротехнических сооружений и насосных станций (2025-2029).pdf

15184.765 KB
---------Chatbot---------
виртуальный помощник